💰 Casa Verde 2026

Casa Verde Programme in Moldova

Up to 200,000 MDL grant for energy renovation (incl. photovoltaics)

Energy efficiency programme — grant covers solar panels combined with home insulation

200.000 MDL

Maximum subsidy amount

50%

Of system cost

0%

Interest rate — non-repayable grant

Full breakdown of the Casa Verde programme with eligibility and requirements:

Read the full Casa Verde 2026 guide →

Grant amount

The 2026 call, launched on 18 March, supports 1,000 households with a total budget of 200 million MDL. Maximum grant per household: 50% of eligible work costs, up to 200,000 MDL (~€10,000). Applications are submitted exclusively online at feerm.md during the active call period.

🏠

Individuals

Owners of residential properties may apply for a grant of up to 50% of eligible work costs, with a ceiling of 200,000 MDL (~€10,000) per household. Budget allocation: 30% for applicants from Chișinău, 70% for other localities. Important: photovoltaic panels with battery storage are eligible only after thermal insulation and window/door replacement have been completed.

🏢

Small and medium enterprises

Small and medium enterprises can access financing through the ODA (Organisation for SME Development) programme: up to 50% of investment, with a maximum of 1.5 million MDL for equipment including solar installations. Casa Verde FEERM is exclusively for individual residential households — legal entities use separate financing channels.

🌾

Agricultural producers

Agricultural producers can access dedicated programmes of the Ministry of Agriculture and Regional Development. Conditions and ceilings for the agricultural sector are established separately from the residential Casa Verde FEERM programme. Check current offers at agricultura.gov.md or through an ANRE-authorised installer.

Who can apply

The programme is open to three categories of applicants:

🏠

Individuals

Individuals who own a property and consume electricity under their own contract.

🏢

SMEs

Legal entities (SRLs, SAs) registered in Moldova that pay taxes and own the building.

🌾

Agricultural farms

Agricultural enterprises and farming households with documented agricultural activity.

⚠️

Important notice

Installing solar panels alone without home insulation is not funded. The programme supports comprehensive energy renovation: wall/roof insulation + window replacement + efficient heating + (optionally) PV panels or solar collectors.

Documents required

Prepare the following documents before starting your application:

  • 📄Completed application form (official template available at feerm.md)
  • 📄Proof of property ownership (title deed or extract from the real estate register)
  • 📄Cost estimate from an ANRE-authorised installer with technical specifications (the estimate must cover the full energy efficiency works package, not panels alone)
  • 📄Copy of identity document (ID card or passport)
  • 📄Bank statement for the last 3 months
  • 📄Electricity supply contract
  • 📄For SMEs: company registration certificate (IDNO)
  • 📄For agri sector: proof of agricultural activity

Application steps

1

Choose your installer

Select an ANRE-authorised installer from the official list or via SolarMD.

2

Get a quote

Request a detailed offer with technical specs and prices.

3

Submit your application

Submit the application online on the Gov.md platform with the required documents.

4

Wait for approval

Approval takes 15–30 working days.

5

Install the system

Once approved, proceed with the solar system installation.

6

Receive the subsidy

The approved amount is transferred to your bank account.

Timeline and calendar

The 2026 call was launched on 18 March 2026 for 1,000 households with a budget of 200 million MDL. Applications are submitted online at feerm.md during the active call period — registration is exclusively electronic. The budget is limited and fills quickly: in the previous call, 745 applications reached the limit in a short time. Follow cned.gov.md or SolarMD news for announcements of future calls.

From the moment of application submission: technical review takes up to 15 working days, payment is made within 30 days of system commissioning and approval.

Combining the subsidy with a private installation

The subsidy does not exclude private financing — you can cover the remaining cost with your own funds, a bank loan or a leasing scheme. Many installers offer combined packages: they help submit the application and simultaneously arrange financing for the part not covered by the grant.

Important: the installation must be carried out by an ANRE-authorised company. A system installed by a non-authorised contractor is not eligible for the programme, even if you prepared all the other documents correctly.

What to do if your application is rejected

A rejection is not the end. The most common reasons and what you can do:

  • Incomplete documentation — resubmit with the missing documents.
  • Installer not on the approved list — choose a different, authorised company.
  • Budget exhausted for the current cycle — apply in the next window.
  • Technical requirements not met — request a revised estimate from the installer.

Installers Who Help with the Casa Verde Grant

These companies have experience with the FEERM programme and will help you prepare your grant application documents.

Frequently asked questions about the subsidy

Can I get the subsidy if I already have solar panels installed?+
No. The programme only covers newly installed systems. Previously installed systems are not eligible, even if they were installed recently.
How long does the review process take?+
Typically 15–30 working days from the date of application submission. During peak periods, this may extend to 45 days.
Can I choose any installer?+
No. The installer must be on the official ANRE-authorised list. SolarMD only lists authorised companies, so you can safely choose any company from our catalogue.
Is the subsidy taxable income?+
As of 2024, the Casa Verde grant was not treated as taxable income for individuals under Moldovan tax law. However, tax rules can change — confirm the current position with a local tax adviser or directly with the State Tax Service before submitting your application.
Can I apply on behalf of a rented property?+
Generally no — the applicant must be the property owner. In exceptional cases a notarised power of attorney from the owner may be accepted, but this must be confirmed with FIE.
What is the minimum system power to be eligible?+
Minimum technical requirements are published in the official FIE documentation and may change between cycles. Verify current parameters with an authorised installer or directly with the fund.
Does Casa Verde cover only solar panels without other works?+
No. Casa Verde 2026 is a comprehensive energy renovation programme. Installing solar panels alone without thermal insulation is not funded. If your home is already insulated — you need to confirm this with documentation (an energy audit).
Is there a separate programme for solar panels only?+
Currently, there is no separate state subsidy in Moldova exclusively for solar panels. The former Fondul pentru Mediu programme with a 45,000 MDL grant has ended. Casa Verde 2026 funds panels only as part of an energy efficiency package. The alternative is instalment plans from installers (eprime, megawatt, etc.).

SolarMD connects you with authorised installers who will help you with the subsidy process.

Leave a request